When assembling bolted GRP or Steel water tanks, one critical design detail is the position of the bolt holes on the tank panels—specifically, whether they are punched on the vertical (flat) side or the bevel (angled) side of the panel rib.
Bolted connection is the standard method for assembling sectional water tank panels because it combines strength, flexibility, durability, and ease of installation—making it the best choice for engineers, contractors, and end users around the world.
Panel Hole Drilling Side Design
The water tank panel side party design like below photo:it has 4 vertical side and 4 bevel side for 1 panel,for the bolt hole,if panel at different position of water tank, then the hole will be punch at vertical side or bevel side according to their position.
As we know,the water tank has 6 face, 8 Vertex and 12 Edge.
Normally there are 3 type different hole drilling type panels, if the water tank has partition panel inside, then it will be has more type of different hole drilling position, if you order partition type water tank, we can send you more details by drawing.
- 4 vertical side (when panel at face side, not edge or vertex position)
- 3 vertical side + 1 bevel side (when panel at edge side but not vertex position)
- 2 vertical side + 2 bevel side (when panel at vertex position)
The Benefit of bolt connection panel type water tank:
✅ Easy to transport by container (save container space)
✅ Easy to assembling at site
Keywords :
#bolted GRP water tank
#bolted steel panel water tank
#modular water tank
#panel type water storage tank
#bolted water tank manufacturers
#industrial bolted water tank
#water tank suppliers
#custom size bolted water tank supplier
#large capacity bolted water storage tank
Inquiry please contact:
Email : cn@cnhbwatertank.cn
Whatsapp✆:+86 15350598856
Web: www.cnhbwatertank.cn
————————————————————————————————————————
“ Wish to be your best partner in China! Welcome to visit our company”